|
|
|
Testing
All panels manufactured and wired at Crown Technical Systems are continuity tested prior to final shipping. Switchgear is power tested to ensure all components are working correctly.
Control buildings are put through a rigorous mechanical and electrical inspection to guarantee all equipment is performing properly. Customers are encouraged to join the engineers while testing is being completed. Test reports are available upon request.
Testing Includes
- Hipot and continuity testing
- CT polarity testing and secondary current injection
- VT and CPT testing
- Breaker testing
- DC logic testing
- Relay trips, lockout
- Alarm outputs
|
|
|
| |
|
|